Construction Documentation Stage

 
 

Construction Documentation Renovation or Custom Home

  • Updated floor plans to reflect client feedback from the design development meeting

    • Floor plans to show incorporation of finalized Structural engineering

    • Building Sections to show incorporation of finalized Structural Engineering

  • Construction Details

    • 1:5 or 1:10 construction details of designed elements of the project

  • Wall schedule

    • Wall schedule to be used in conjunction with floor plans, allocate materials/thicknesses/location of wall types

  • Finalized Material Schedule

  • Finalized Lighting and Electrical Plans

  • Finalized Lighting and Electrical Schedule

  • Finalized Services Plan

  • Finalized Services Schedule

  • Design to be coordinated with ESB Report and Structural Engineering in preparation for Tender Stage

    • Client meeting to review overall Construction Documents as listed above and to get client feedback